On Soundings Navigation™

On Soundings Navigation™

Passage planning in shallow water: tides, squat and under-keel clearance.

A ship is on soundings where the lead finds bottom. That is where this program works: on a river bar, in a dredged channel, over a shallow approach, wherever the question is how much water will be under the keel, when, and at what speed.

Give it the ship, the route and the tide tables. It works out the height of tide along the whole route, the squat at every speed, and the speed to order at each waypoint, so that the shallow places are passed on the right tide with the under-keel clearance you require.

A section along the route of an example passage. The water surface is a level line. Below it the seabed rises and falls from leg to leg, with the charted depths written on it in slanted figures. A heavy line shows the keel of the ship under way, a red band on the seabed the clearance required. A small yacht with orange sails marks the place of least water, with rules beside her keel: depth of water 12.30 m, draught 9.90 m, squat 0.72 m, minimum UKC 1.68 m. Above the water a band shows the speed ordered on each stretch and arrows the current; the last part of the passage is shaded as darkness.
The plan of an example passage as a section along the route. The seabed stands at the depth of water the ship finds on each leg at the time she is there: charted depth and height of tide together. The heavy line is her keel under way, draught and squat; the red band is the clearance required. The yacht marks the place looked at and can be taken along the route.

What it works out

The plan follows every entry; there is no button to press.

The tide along the whole route
High and low waters, or heights at every hour, for any number of tidal stations: typed, pasted from the published table, or read from the PDF of the table (two makes of table so far). Between the stations the time and the height of each tide are carried along the route by distance, so every leg has its own tide for the time the ship is on it.
Squat
By Barrass, by ICORELS, or from the ship’s own squat table; in open or confined water, with the width of the channel where it matters. Draught is corrected for the density of the water on each leg.
Departure and speed orders
You say what matters: the greatest clearance, the earliest arrival with the clearance required, as little darkness as possible, or a speed of your own. The program finds the time to leave and the speed to order at each waypoint. Single legs can be kept to daylight, and waiting allowed where the ship can wait.
Current
Rates entered leg by leg or, where none are known, a tidal stream estimated from the tide tables themselves and marked as an estimate. Speed over the ground stands beside speed through the water on every leg.
The route from the ECDIS
Waypoints typed, pasted, or taken from a route file (RTZ, RTZP, GPX) together with the XTD of each leg. A corrected route keeps the depths already entered on the legs that did not move.
The least depth of each leg, against the chart
A raster chart opened as a file (GeoTIFF) is shown with the route on it. Where the program can read the chart’s figures, it proposes the least sounding within the XTD of each leg; the figure is always yours to take or to change. Where it cannot, the chart is a picture with the route on it.
Under way
Type the actual time of passing a waypoint and the rest of the plan is worked out again from it. With a position from the GPS of a tablet or from the ship’s AIS, the program shows the leg she is on, how far she is off the track against the XTD, the minutes ahead of or behind the plan, and the current as measured.
On board
One page that works in the browser of a computer without internet, in English and in Russian, with colours for day and for night. The plan can be locked against changes by accident, saved to a file and passed to another ship.

The plan, on paper and under way

The pictures are of the example passage that comes with the program; the ship in it is called MV Example.

Two lists from the program. Speed orders: 06:50 proceed at 12.8 knots from the anchorage, 13:30 reduce to 8 knots at WP18, 16:20 increase to 10 knots at WP27, 18:48 reduce to 8 knots at WP30, 20:41 increase to 10 knots at WP32, 21:30 increase to 12.8 knots, 22:36 arrive. Where the UKC is least: five legs with the time on the leg, dynamic UKC from 1.68 to 1.73 metres, static UKC and height of tide.
Speed orders with their times, and the five legs where the clearance is least.
The first ten lines of the plan table. For each waypoint: ETA, an empty field for the actual time of passing, and for the leg to the next waypoint the speed ordered, course, distance, distance run, time on the leg, speed over the ground, current, least charted depth, least height of tide, draught, squat, static and dynamic UKC, and remarks.
The plan table: one line a waypoint, with the leg that begins there. A time of passing typed in the column ATA works the rest of the plan out again.
An A4 sheet on its side: the title of the passage plan with the ship’s name, the verdict and the facts of the passage, the tides used, and the plan table for all waypoints on one page.
The same plan saved as an Excel sheet, set up for one A4 page on its side.

A sheet for the bridge file

The verdict, the facts of the passage, the tidal stations used and every leg of the plan stand on one page, with a column left empty for the actual times of passing.

The sheet holds figures, not formulas: it is a record of the plan as it was worked out, to be printed, signed and kept.

The box The ship now: position, speed and course over the ground, heading, speed through the water 8.1 knots typed from the log, current now measured plus 1.3 knots while the plan has plus 2.7, leg WP22 to WP23 with 1.5 miles run and 2.3 to go, on the track, 5 minutes behind the plan, next waypoint WP23 at 15:18 at this speed against 15:11 in the plan.
The ship now: the leg she is on, her place against the track and against the plan, and the current as measured, speed over the ground less the speed by the log. The figures here are made up for the picture.

Where it stands

November 2026. The program is still being built and tried by its author. It is not released and not on sale, and it is not offered for download here.

Some parts are so far proved only on the bench and not yet at sea: the position of the ship from the GPS or the AIS, and the program as an app on a tablet.

A planning aid, not a navigation system. Not for navigation.

It does not take the place of the official charts and publications, the ECDIS, the echo sounder, the ship’s own squat data, the pilot, or the judgement of the Master and the officer of the watch.

Terms of use

Check every figure
What comes out depends on what is put in and on methods that are approximations. A predicted tide is not the tide that comes; a charted depth is not the depth that is there today; an estimated current is an estimate. Check the results against official sources before relying on them, and keep watching the echo sounder.
Charts and tide tables are yours
The program brings no charts and no tide tables with it; its example carries a few days of predictions as an illustration only. The files you open stay on your device. It is for you to see that you may use them and that they are up to date. A chart opened as a picture is not corrected by Notices to Mariners and is not for navigation.
Position of the ship
Where the program shows the ship, the position is the one your device or your AIS gives, and the mark on the chart is not to scale. It is an aid to watching the plan, never the means of fixing the ship’s position.
No warranty
The program is offered as it is, without warranty of any kind. As far as the law allows, the author is not liable for loss or damage that comes from its use or from relying on its results. The safe navigation of the ship stays with those in charge of her.
Your data
The plan, the charts and the tide tables are kept in the store of the browser on your device and nowhere else. The program sends nothing to its author or to anyone.
Rights
The program, its texts and its pictures, and the texts and pictures of this page, may not be copied, changed, sold or passed on without the written permission of the author. The type of this page is Old Standard TT, used under the SIL Open Font License 1.1.